Tiles, sanitary ware, doors and windows, hardware, pipes and waterproofing — from Foshan, Chaozhou and the Guangdong construction belt, where most of the world’s ceramic tile is fired.
建筑材料
Construction buyers face a particular problem: the products are heavy, the margins are thin, and a single specification error becomes several tonnes of unsellable inventory. Colour variation between production lots, a sanitary ware bore that does not match local plumbing standards, a door leaf that warps in humid transit — none of these show up in a photograph.
We source construction materials the way a contractor would: by lot, with retained samples, and with the technical specification written down before anyone quotes a price.
Do not have all of this? That is normal. Send what you have — a photo, a competitor link, a sample — and we will build the specification with you.
Indicative only, and quoted honestly rather than optimistically. Actual figures depend on specification, season and factory loading — and lead time starts from approved sample, not from enquiry.
| Item | Typical MOQ | Production lead time |
|---|---|---|
| Ceramic tile | 1 x 20ft container (approx. 1,200–1,500 m²) | 20–30 days |
| Sanitary ware | 300–500 pcs mixed | 25–35 days |
| Aluminium profile | 3–5 tonnes | 25–40 days |
| PPR / uPVC pipe | 1 x 40HQ container | 20–30 days |
| Paint & coatings | 500–1,000 units | 15–25 days |
We take your specification to the right cluster, shortlist factories with a track record in exactly this product, and return options with pricing, MOQ and lead time side by side.
Sample approval, then in-line and pre-shipment inspection against a written checklist, with photographs, while the goods are still in China and still fixable.
Consolidation, packing, freight booking and the full document set — invoice, packing list, certificate of origin, bill of lading and any inspection certificate your market requires.
Send a photo, a drawing, a link or a sample reference on WhatsApp — you will have a considered reply, usually within one working day.