Construction, agricultural, packaging, processing and workshop machinery — from Shandong, Jiangsu, Zhejiang and Henan, with commissioning and spares planned in advance.
机械设备
Machinery is the highest-stakes category we handle. The unit values are large, the specifications are technical, and a machine that arrives incompatible with local voltage or without a spare-parts channel is not a bad purchase — it is a stopped business.
We insist on a written technical specification, a factory acceptance video, and a documented spares and support arrangement before any deposit is paid.
Do not have all of this? That is normal. Send what you have — a photo, a competitor link, a sample — and we will build the specification with you.
Indicative only, and quoted honestly rather than optimistically. Actual figures depend on specification, season and factory loading — and lead time starts from approved sample, not from enquiry.
| Item | Typical MOQ | Production lead time |
|---|---|---|
| Packaging machinery | 1 unit | 35–60 days |
| Food processing lines | 1 line | 45–75 days |
| Construction machinery | 1 unit | 30–60 days |
| Agricultural equipment | 1–5 units | 30–50 days |
| Injection moulding | 1 unit + moulds | 45–80 days |
We take your specification to the right cluster, shortlist factories with a track record in exactly this product, and return options with pricing, MOQ and lead time side by side.
Sample approval, then in-line and pre-shipment inspection against a written checklist, with photographs, while the goods are still in China and still fixable.
Consolidation, packing, freight booking and the full document set — invoice, packing list, certificate of origin, bill of lading and any inspection certificate your market requires.
Send a photo, a drawing, a link or a sample reference on WhatsApp — you will have a considered reply, usually within one working day.